The desk
Today's report
Asks
- #894: restart the M4 drill (
launcher/swarm launch builder --issue 894) if[build]hasn't by noon? - PR #1027 (M7): will you take it by hand once reviewed?
- #991, #992, #1007, #1021: close them, or allow the planner's
gh issue close? - #977: triage it (
troublemisses merger merges under authority).
Monday check-in: Monday check-in, Mon 2026-11-16: M6 and M7 moved; M4 at risk (drill stopped since Thu); M1, M2, M3 and Engine host held with no open work.
Plan
M1 Daily report runs without the owner 0 open, 10 done
Nothing open under it.
M2 Merges under delegation 0 open, 9 done
Nothing open under it.
M3 The Desk shows the plan and the report 0 open, 10 done
Nothing open under it.
M4 Readiness review 2 open, 14 done
M6 Specs written in Notion ship through the swarm 1 open, 9 done
M7 The Desk shows what kind of work the swarm ships 2 open, 2 done
- #1011 Effort-mix label set and labelled data go PR #1027
- #1012 Effort-mix classifier not go: @mattmcalister commented on #1012: that's a veto until @mattmcalister labels it
ready
M8 I hear back from the department without checking on it 1 open, 0 done
Area Engine host 0 open, 2 done
Nothing open under it.
Trouble
open-agentos/productswarm, from swarm trouble at 2026-11-16T18:13:55+00:00
Area open-agentos/productswarm#687 Area: Engine host
Progress
- unmeasured: not known to be on track every working-day check runs on the host (none missed for more than one sweep interval) (no measure yet)
- unmeasured: not known to be on track a webhook starts a check within a second (no measure yet)
- unmeasured: not known to be on track a nightly backup of `swarm.db` exists for each of the last 7 days (no measure yet)
Stuck
none
Waiting on the owner
none
On the owner's authority, last 24h
none
Goal open-agentos/productswarm#1029 M8: I hear back from the department without checking on it
Progress
- unmeasured: not known to be on track **Hand trial:** on at least 3 working days, the planner writes a briefing next to the daily report on the report issue, before anything is built. I record after each one whether it passed the test below. (no measure yet)
- unmeasured: not known to be on track **The test:** after the briefing alone I can answer (1) what can the product do now that it couldn't at the last briefing, (2) which Goals moved, which stalled, and why, and (3) how many decisions wait on me and where. I mark each day pass or fail on the report issue, and it passes on at least 3 of the trial days. (no measure yet)
- unmeasured: not known to be on track **Built:** once the trial passes, `[daily]` produces the briefing every working day, and the Bridge shows it first, above the decisions waiting. (no measure yet)
- unmeasured: not known to be on track **Away from the desk:** the briefing reaches me somewhere other than GitHub or the Desk, as audio or a message. Which one is set by a ruling (below), and I use it on at least 5 working days. (no measure yet)
Stuck
- #1031 PR #1033 merged, but #1031 is still open (since 2026-11-16, 0h)
Waiting on the owner
none
On the owner's authority, last 24h
none
Goal open-agentos/productswarm#683 M1: Daily report runs without the owner
Progress
- in progress a daily report posts without the owner starting it (no report in the last 10 working days started by [daily] (swarm daily))
- unmeasured: not known to be on track the Monday check-in posts when the watcher is run at a Monday clock in a test (no measure yet)
- unmeasured: not known to be on track the daily report and the check-in read `swarm trouble` (no measure yet)
Stuck
none
Waiting on the owner
none
On the owner's authority, last 24h
none
Goal open-agentos/productswarm#684 M2: Merges under delegation
Progress
- unmeasured: not known to be on track a go PR is built, reviewed and merged with no act of mine (no measure yet)
- unmeasured: not known to be on track a protected-path PR merges on my approval alone, with no merge click from me (no measure yet)
- unmeasured: not known to be on track a PR that needs a fix (changes requested, an overstep I ruled on, or a merge conflict) is fixed and merged without a hand start, whichever role wrote it (no measure yet)
- unmeasured: not known to be on track an unreviewed revert is refused, shown in a drill in the scratch repo (no measure yet)
Stuck
none
Waiting on the owner
none
On the owner's authority, last 24h
none
Goal open-agentos/productswarm#685 M3: The Desk shows the plan and the report
Progress
- unmeasured: not known to be on track a fixed list of state questions, written as a Brief under this Goal, is each answerable from the Desk alone (no measure yet)
- unmeasured: not known to be on track that list is checked by a test against a fixture state, including cases that haven't happened yet (a stalled PR, a question waiting on me, a failed Area target) (no measure yet)
Stuck
none
Waiting on the owner
none
On the owner's authority, last 24h
none
Goal open-agentos/productswarm#686 M4: Readiness review
Progress
- unmeasured: not known to be on track the review is held against a checklist, written as a Brief under this Goal (no measure yet)
- unmeasured: not known to be on track one scripted drill in the scratch repo, under a Goal I open, runs to the end with no act of mine but opening the Goal, answering its question and approving its protected-path PR (no measure yet)
- unmeasured: not known to be on track the drill includes: several Tasks built, reviewed and merged by the merger; a planted defect the reviewer catches (gate 13); a changes-requested loop on a PR the builder didn't write; a merge conflict; one protected-path PR; one `gov:question`; a pause of that repo alone (gate 19) (no measure yet)
- unmeasured: not known to be on track my acts in the drill are counted and reported by `swarm acts`, with no budget (no measure yet)
- unmeasured: not known to be on track the review's result is recorded on this issue (no measure yet)
Stuck
none
Waiting on the owner
none
On the owner's authority, last 24h
none
Goal open-agentos/productswarm#938 M6: Specs written in Notion ship through the swarm
Progress
- unmeasured: not known to be on track `swarm specs pull` turns the Ready features of a Notion initiative linked to an owner-opened Goal into go sub-issues, each carrying a dated spec snapshot (#937 §5.2) (no measure yet)
- unmeasured: not known to be on track `swarm specs diff` catches a real spec edit made mid-run, and the lead resolves it in the daily report (adopt, defer or ask) (#937 §5.3) (no measure yet)
- unmeasured: not known to be on track `swarm specs push` writes status, PR links and one delivery comment per merge back to Notion, idempotently, as the `productswarm` integration (#937 §5.4) (no measure yet)
- unmeasured: not known to be on track `swarm specs render` produces the run's page from run data alone, with no hand edits (#937 §5.5) (no measure yet)
- unmeasured: not known to be on track shown end to end once with the Effort mix initiative in Notion, run by hand twice before any `swarm watch` trigger (#937 §11–12) (no measure yet)
Stuck
- #1007 PR #1009 merged, but #1007 is still open (since 2026-11-13, 3d)
Waiting on the owner
none
On the owner's authority, last 24h
none
Goal open-agentos/productswarm#987 M7: The Desk shows what kind of work the swarm ships
Progress
- unmeasured: not known to be on track every merged PR carries an effort label, from the classifier or my `kind:*` correction (no measure yet)
- unmeasured: not known to be on track the Desk shows effort per Goal and a capability-share trend by week (no measure yet)
- unmeasured: not known to be on track the classifier passes its pre-registered pass mark on a held-out set I labelled, or the report says it doesn't and the `paths` baseline is used instead (no measure yet)
Stuck
none
Waiting on the owner
none
On the owner's authority, last 24h
none
Under no Goal or Area
Stuck
- #991 PR #1000 merged, but #991 is still open (since 2026-11-13, 3d)
- #992 PR #1001 merged, but #992 is still open (since 2026-11-13, 3d)
- #1021 PR #1024 merged, but #1021 is still open (since 2026-11-14, 2d)
- #249 the planner stopped: the next piece it needs has no issue yet, so nothing will start it (since 2026-11-16, 7h)
Waiting on the owner
- #751 no label, and under no Goal or Area (waiting since 2026-11-11, 5d)
- #760 no label, and under no Goal or Area (waiting since 2026-11-11, 5d)
- #908 no label, and under no Goal or Area (waiting since 2026-11-12, 4d)
- #909 no label, and under no Goal or Area (waiting since 2026-11-12, 4d)
- #977 no label, and under no Goal or Area (waiting since 2026-11-12, 4d)
On the owner's authority, last 24h
none
not read: swarm acts: not synced here; `launcher/swarm acts` counts the owner's acts
On the floor
No session is working.
idle: builder 36 min
Grants in use
The merger is live.
Merged
- #1033 planner: write the M8 hand-trial briefing beside the daily report: merged under approved ask,
Left for you
- #1027 Effort-mix label set and labelled data (#1011): left for you: 5016 changed lines, over [merger] max_changed_lines 500,
The merger's comments on PRs in the last 24 hours, each PR's latest, newest first; times in UTC. Other uses of delegated authority are in the daily report.
The wire
Today in UTC, newest first: questions opened, the owner's rulings and lapses, records merged, the reviewer's requested changes and committees convened.
What the numbers say
- 0.4 questions per merged PR this week, up from 0.2 the week before.
- Median 0.5 hours to decide (56 questions).
- 2.4 records a day; none since 12 Nov.
The last 14 days in UTC; "this week" is the last 7. Under 3 merged PRs, decided questions or records a trend says "too few to tell": one or two values can't show a direction. A question is decided when the owner first adds gov:ruled or ready, or else when it closes.
How the questions went
56 questions asked in the last 14 days (from 3 Nov).
- Asked by: agents 40, the owner 16.
- Decided by: the owner 53, a committee 3, lapsed 0, still open 0.
- Became: a record 31, direction only 17, nothing yet 8.
Asked by the owner: the owner opened it, or its "Raised by" starts with "owner". Decided by a committee: a committee Discussion serves it or its record's shape is committee; by the owner: the owner added gov:ruled or ready, it has a record, or it was closed without gov:lapsed. Became a record: a file in governance/decisions/ answers it; direction only: ruled or ready with no record, which is not precedent (GOV-0006).
Precedent in use
- GOV-0041, the newest record, was cited 15 times on its first day (2026-11-12) and 17 in all.
- 85% of citations are by agents (1429 of 1678); 15% are by the owner.
- Every in-force record was cited in the last 14 days.
| Record | 11-03 | 11-04 | 11-05 | 11-06 | 11-07 | 11-08 | 11-09 | 11-10 | 11-11 | 11-12 | 11-13 | 11-14 | 11-15 | 11-16 | Total | Agents | Owner | By reviewer |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| GOV-0041 | 15 | 2 | · | · | · | 17 | 8 | 9 | 3 | |||||||||
| GOV-0040 | · | 15 | 1 | · | · | 1 | 17 | 14 | 3 | 7 | ||||||||
| GOV-0039 | · | 12 | 1 | · | · | · | 13 | 12 | 1 | 4 | ||||||||
| GOV-0038 | · | 5 | · | · | · | · | 5 | 4 | 1 | 1 | ||||||||
| GOV-0037 | · | 5 | · | · | · | · | 5 | 2 | 3 | 0 | ||||||||
| GOV-0036 | · | 7 | 2 | · | · | · | 9 | 8 | 1 | 3 | ||||||||
| GOV-0035 | · | 2 | · | · | · | · | 2 | 2 | 0 | 0 | ||||||||
| GOV-0034 | 8 | 3 | 4 | 4 | · | · | · | · | 19 | 16 | 3 | 7 | ||||||
| GOV-0033 | 6 | 5 | 14 | 11 | 4 | 1 | · | · | 41 | 29 | 12 | 10 | ||||||
| GOV-0032 | · | · | 14 | 2 | 7 | 1 | · | · | · | · | 24 | 19 | 5 | 8 | ||||
| GOV-0031 | · | · | 45 | 5 | 46 | 27 | 6 | · | · | 2 | 131 | 121 | 10 | 62 | ||||
| GOV-0030 | 1 | 3 | · | 4 | · | 9 | 3 | · | · | · | · | 20 | 16 | 4 | 6 | |||
| GOV-0029 | 29 | 2 | · | 3 | 1 | 5 | 3 | · | · | · | · | 43 | 35 | 8 | 15 | |||
| GOV-0028 | 5 | 2 | · | 1 | 2 | 8 | 3 | · | · | · | · | 21 | 19 | 2 | 4 | |||
| GOV-0027 | 43 | 7 | · | 33 | 14 | 51 | 60 | 16 | 4 | · | 6 | 234 | 216 | 18 | 139 | |||
| GOV-0026 | 30 | 5 | · | 14 | · | · | · | · | · | · | · | 49 | 42 | 7 | 19 | |||
| GOV-0025 | 4 | 1 | · | 3 | 2 | 3 | · | · | · | · | · | 13 | 11 | 2 | 3 | |||
| GOV-0024 | 7 | · | · | · | · | · | · | · | · | · | · | 7 | 6 | 1 | 3 | |||
| GOV-0023 | 29 | · | · | · | · | 2 | · | · | · | · | · | 31 | 29 | 2 | 9 | |||
| GOV-0022 | 33 | 4 | · | 2 | · | 1 | · | · | · | · | · | 40 | 31 | 9 | 10 | |||
| GOV-0021 | 27 | 10 | 2 | · | · | 2 | · | 14 | 3 | 1 | · | · | · | 59 | 51 | 8 | 13 | |
| GOV-0020 | 22 | 1 | 9 | 8 | · | 3 | · | · | · | · | · | · | · | 43 | 29 | 14 | 7 | |
| GOV-0019 | 7 | 11 | · | · | · | · | · | · | · | · | · | · | · | · | 18 | 17 | 1 | 5 |
| GOV-0018 | 4 | 14 | 2 | 2 | · | · | · | 1 | · | 1 | 2 | · | · | · | 26 | 18 | 8 | 4 |
| GOV-0017 | 6 | 15 | 3 | 4 | · | · | · | · | · | · | · | · | · | · | 28 | 21 | 7 | 5 |
| GOV-0016 | 8 | 18 | · | 2 | · | · | · | · | 1 | 1 | · | · | · | · | 30 | 24 | 6 | 6 |
| GOV-0015 | 26 | 7 | 2 | 6 | · | · | · | · | · | · | 1 | · | · | · | 42 | 36 | 6 | 7 |
| GOV-0014 | 23 | 3 | 8 | 7 | 2 | · | 2 | · | 3 | 2 | · | · | · | · | 50 | 41 | 9 | 13 |
| GOV-0013 | 18 | 8 | 1 | 14 | · | · | · | 1 | 2 | 1 | · | · | · | · | 45 | 35 | 10 | 8 |
| GOV-0012 | 24 | 7 | · | 17 | 2 | · | 4 | 1 | 2 | · | 1 | · | · | · | 58 | 50 | 8 | 13 |
| GOV-0011 | 36 | 11 | 2 | 14 | · | · | 2 | 2 | 10 | 6 | · | · | · | 3 | 86 | 73 | 13 | 22 |
| GOV-0010 | 28 | 4 | · | 17 | 4 | · | 4 | · | 6 | 4 | · | · | · | · | 67 | 56 | 11 | 10 |
| GOV-0009 | 31 | · | 1 | 16 | 2 | · | · | · | 1 | · | · | · | · | · | 51 | 46 | 5 | 9 |
| GOV-0008 | 21 | 2 | · | 4 | 1 | · | 1 | · | · | 1 | · | · | · | · | 30 | 26 | 4 | 7 |
| GOV-0007 | 37 | 9 | · | 24 | 1 | · | 3 | · | 16 | 7 | 1 | 1 | · | · | 99 | 91 | 8 | 39 |
| GOV-0006 | 33 | 9 | 6 | 30 | 1 | · | 3 | 2 | 15 | 3 | · | · | · | · | 102 | 89 | 13 | 28 |
| GOV-0005 | 9 | · | 2 | 2 | · | · | · | · | · | · | · | · | · | · | 13 | 10 | 3 | 2 |
| GOV-0004 | 13 | 2 | 2 | 1 | 2 | · | 1 | 1 | 4 | 2 | 2 | · | · | · | 30 | 25 | 5 | 5 |
| GOV-0003 | 5 | 4 | 2 | · | · | · | 1 | · | · | · | · | · | · | · | 12 | 11 | 1 | 3 |
| GOV-0002 | 15 | 3 | 9 | 3 | 2 | · | 1 | 1 | 4 | · | 2 | · | · | · | 40 | 33 | 7 | 7 |
| GOV-0001 | · | · | · | 8 | · | · | · | · | · | · | · | · | · | · | 8 | 7 | 1 | 2 |
A citation is a GOV-NNNN mention in an issue or PR body, comment or review, once per text, on or after the record's date. Signature lines, tracking issues, the digest issue and review comments on governance/ files don't count. Days are UTC; a blank cell is before the record was made.
Past committees
no ruling recorded
- 2 of 3 rounds
claude-opus-5-5,claude-sonnet-5-5· §7.2 met- 49 minutes first to last post
- swing: 3 of 3 seats changed
no ruling recorded
- 2 of 3 rounds
claude-opus-5-5· §7.2 met- 6 minutes first to last post
- swing: 3 of 3 seats changed
“Reviewer requests changes only for a numbered block-list finding with evidence that the builder can fix inside the PR's issue; overstep outranks red; draft, not intent, skips review; amends GOV-0011's red and amber; eval gate is an unannounced planted-defect PR”
- 2 of 3 rounds
claude-opus-5-5,claude-sonnet-5-5· §7.2 met- 6 minutes first to last post
- swing: 3 of 3 seats changed
The needs-you list, sessions, open PRs, reviewer sweeps, v3 progress and spend are on Operations; the full decision log, open and lapsed gov questions, and every committee's round grid are on Decisions.